|
⇤ ← Revision 1 as of 2006-09-10 03:26:44
Size: 557
Comment:
|
Size: 988
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 1: | Line 1: |
| = Version 0.1 DC Readout / OMC System = ---- |
|
| Line 16: | Line 18: |
| -------- = Next Generation DC Readout Notes = * Put the resistors on the PD block, not the nipple. * Wider separation for the PDs so the ghost beam can get wedged out. * Black glass ring around the PD cans * Black glass dumps all over the place for the leak throughs. * Don't use any of the Piezo-Jena crap. * Don't use copper for the OMC body. All fused-silica, all the time. * |
Version 0.1 DC Readout / OMC System
See [http://www.ligo.caltech.edu/~rward/dcreadout/ Rob Ward's DC Readout page].
http://www.ligo.caltech.edu/~rward/dcreadout/OOwiring.pdf
Rob's controls block diagram: http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/DCdetectWiring.pdf
Jay's wiring diagram D060096 3/30/06: http://www.ligo.caltech.edu/~cit40m/Docs/DCdetect/D060096-00-40M_DC_Detection_Wiring.pdf
Sam's schematic alignment digital controls http://www.ligo.caltech.edu/~swaldman/DitherLock_Strawman_V3.pdf
Vacuum opening Plan of Action
Next Generation DC Readout Notes
- Put the resistors on the PD block, not the nipple.
- Wider separation for the PDs so the ghost beam can get wedged out.
- Black glass ring around the PD cans
- Black glass dumps all over the place for the leak throughs.
- Don't use any of the Piezo-Jena crap.
- Don't use copper for the OMC body. All fused-silica, all the time.
