Differences between revisions 2 and 16 (spanning 14 versions)
Revision 2 as of 2011-02-06 03:30:45
Size: 2878
Editor: KojiArai
Comment:
Revision 16 as of 2011-04-20 18:44:12
Size: 3053
Comment: Cleaning up CDS pages
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
## page was renamed from CDS
Line 6: Line 7:
attachment:CDS_image.jpg  attachment:CDS_image.jpg
Line 19: Line 20:
 . <<ImageLink(green.png, Upgrade_09/CDS/Action_items_for_CDS_upgrade)>> [[Upgrade 09/CDS/Action items for CDS upgrade|Action items for CDS upgrade]]   
 . <<ImageLink(green.png, Upgrade_09/CDS/August_CDS_test)>> [[Upgrade 09/CDS/August CDS test|CDS test plan for August 2010]]   
 . <<ImageLink(green.png, Upgrade_09/CDS/September_CDS_plan)>> [[Upgrade 09/CDS/September CDS plan|CDS test plan for September 2010]]   
 . <<ImageLink(green.png, Upgrade_09/CDS/Action_items_for_CDS_upgrade)>> [[CDS/Action items for CDS upgrade|Action items for CDS upgrade]]
 . <<ImageLink(green.png, Upgrade_09/CDS/August_CDS_test)>> [[CDS/August CDS test|CDS test plan for August 2010]]
 . <<ImageLink(green.png, Upgrade_09/CDS/September_CDS_plan)>> [[CDS/September CDS plan|CDS test plan for September 2010]]
 . [[CDS/todo|general todo list]]

=== SVNs ===
[https://redoubt.ligo-wa.caltech.edu/websvn Advanced LIGO RTS SVN]
Line 41: Line 46:
 . PDF file for the new CDS setup with stop/go points between simulated and real operation: attachment:Joe_CDS_Plan.pdf

. SVG file for CDS layout: attachment:Joe_CDS_Plan.svg
 . New CDS setup with stop/go points between simulated and real operation: [attachment:Joe_CDS_Plan.pdf PDF], [attachment:Joe_CDS_Plan.svg SVG]
Line 46: Line 49:

 . [[CDS/CDS Map|CDS Map]]
Line 51: Line 56:
|| Rolf's RCG admin guide || [https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=1032 T080136]] || || Rolf's RCG admin guide || [https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=1032 T080136]||
Line 61: Line 66:
 . {i} [[Simulated Plant|link to Simulated Plant page]]  . {i} [[Advanced_Techniques/Simulated_Plant|link to Simulated Plant page]]
Line 63: Line 68:
 . [[Generating DOF->PD digital filters based on Optickle modeling]]  . [[Advanced_Techniques/Simulated_Plant/Convert_Matlab_TF_to_CDS_FOTON_filter_format|How to make the filters for the Sim Plant]]

<<TableOfContents: execution failed [Argument "maxdepth" must be an integer value, not "[maxdepth]"] (see also the log)>>

DAQ

New Control and Data Systems

attachment:CDS_image.jpg

List of Major CDS Digital/Controls/Computer Upgrades

  1. c1lsc, c1susvme1, c1susvme2, c1iscex, c1iscey, c1sosvme, c1asc, c1dcuepcs, c1losepics, c1iscepics

  2. All of the above combined into a single 16-core Borkspace machine
  3. New FE code for all of those will need to be made
  4. Blue IO Chassis' to contain all of the new GS ADCs and DACs

BRBR

Plans

SVNs

[https://redoubt.ligo-wa.caltech.edu/websvn Advanced LIGO RTS SVN]

Upgraded FE layout plan

Diagrams

  • New CDS setup with stop/go points between simulated and real operation: [attachment:Joe_CDS_Plan.pdf PDF], [attachment:Joe_CDS_Plan.svg SVG]
  • Suspension model: attachment:suspension_model.graffle attachment:suspension_model.pdf
  • CDS Map

Documents

Description

files

Jay's Slides from the CDS/40m telecon

attachment:Jay_080425.pdf

Rolf's RCG developer guide

[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=1033 T080135]

Rolf's RCG admin guide

[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=1032 T080136]

Rolf's PCI expansion chassis numbering

[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=15113 T1000523]

Jay's wiring diagram

attachment:EndWiring.pdf

Cables and Wiring to ADC/DAC/BO cards

Simulated Plant

New MEDM Screens