## page was renamed from Upgrade 09/CDS/Action items for CDS upgrade = Stage 1 = == Hardware == . '''1)''' Keep list of current hardware up to date: [[Upgrade_09/CDS/current_hardware|Upgrade 09/CDS/current_hardware]] . '''2)''' Acquire list of planned hardware from Jay . '''3)''' Determine if there's hardware that we need that is not on list 1 or 2 . '''4)''' Get hardware to the 40m and connect it == Software == . '''1)''' Create and maintain master list of RFM memory locations, blocking off sections needed for both current and future models (such as simulated plants). . '''2)''' Create and maintain master list of shared memory locations for models. If possible try to ensure all models and controls could be run on a single machine if necessary. . '''3)''' Formalize naming conventions, work out final "map" of all models and computers. [[Upgrade_09/CDS/current_software_map|Upgrade 09/CDS/current_software_map]] . '''4)''' Create final automated medm screens and model pieces (matrix of filter modules, automated real->simulated plant switch incorporating ADC/DACs, nice filter medm screens, etc) . '''5)''' Basic controls models working (Suspensions, LSC, ASC, OMC, ASS all working together) '''6)''' Basic controls medm screens working = Stage 2 = == Software == . '''1)''' Get a basic simulated plant working for one controller (single suspension with pendulum filter for example) . '''2)''' Get multiple basic simulated plants working together (simulated arm, transmitted light strength to QPDs) . '''3)''' Get a basic interferometer simulated plant working (simulated PSL injecting light into a full interferometer) . '''4)''' Add more advanced noises/transfer functions. ||Job (Who needs to do it) ||Estimated Time to Do ||6/7-6/11 ||6/14-6/18 ||6/21-6/25 ||6/28-7/2 ||7/5-7/9 ||7/12-7/16 ||719-7/23 ||7/26-7/30 || ||Make space in 1Y2 and 1X3 for new IOO chassis (Joe/Steve/Input from Rana?) ||3 days || || || || || || Planned || || || ||Install IO chassis/Computers/DAQ router (Joe/Alex/Steve) ||1 Week || || || || Planned (SUS) || Planned (LSC, South End) || Planned (IO) || || || ||Run ethernet for DAQ, Run fiber for timing board to ends, Run Dolphin cables for LSC (Joe/?) ||1 day || || || || || Planned || || || || ||Get IOP processor code working (Alex/Rolf) ||1 week ?? || || || || || || || || || ||Get IOP processor code to handle switch from real to sim plant (Alex/Rolf) ||1 week-1 month?? || || || || || || || || || ||Make Filter Matrix part (Joe/Alex) ||2 days ||Done || || || || || || || || ||Get AA filters, (de)whitening filters (Joe) ||1 day ||Done || || || || || || || || ||Make script to populate filters (Joe) ||2 days ||Done || || || || || || || || ||Make medm screens (Joe) ||3 days || || In Progress || || || || || || || ||Add noise generators to all models (Joe) ||2 days || ||Planned || || || || || || || ||Fix Binary Output handling in plants (Joe) ||1 week || || ||Planned || || || || || || ||Test full LSC/LSP with vertex/end suspensions (Joe) ||1 week || || || ||Planned || || || || || ||Build IO controller/plant models (Joe) ||2 days || || || || ||Planned || || || || ||Test full LSC/LSP with IO and vertex/end suspensions (Joe) ||3 days || || || || ||Planned || || || || ||Add green locking/add green locking plant (Joe/Kiwamu) ||1 week || || || || || ||Planned || || || ||Prepare ADC/DAC interface for green locking (kiwamu) ||1 week? || || || || || ||Planned || || || ||Test green controls/simulated plant (Joe/Kiwamu) ||3 days || || || || || || ||Planned || || ||Convert to actual ADCs/DAC/BIO inputs (Joe) ||2 days || || || || || || ||Planned || ||