|
Size: 341
Comment:
|
Size: 105
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 1: | Line 1: |
| ---- * Design and ASC scheme after we design one for AdvLIGO * Implement and test the new InGaAs, in-vac, high power, FTC WFS. The 40m WFS need not be in-vac, but they should be packaged as such. * Measure spring stuff ---- [[Simulink Model of 40m Optical Springs]] ---- Calculation of the 40m ASC sensing matrix attachment:40m.pdf |
[[RF_ASC|RF based alignment & sensing control]] [[Dither ASC|Dither based alignment & sensing control]] |
