|
Size: 282
Comment:
|
← Revision 22 as of 2012-01-03 23:03:06 ⇥
Size: 192
Comment: converted to 1.6 markup
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 1: | Line 1: |
| -------- * Design and ASC scheme after we design one for AdvLIGO * Implement and test the new InGaAs, in-vac, high power, FTC WFS. The 40m WFS need not be in-vac, but they should be packaged as such. * Measure spring stuff -------- [[Simulink Model of 40m Optical Springs]] |
= Alignment Sensing and Controls = * [[RF_ASC|RF based alignment & sensing control]] * [[Dither_ASC|Dither based alignment & sensing control]] * [[MC_WFS| MC Wave Front Sensors]] |
