| = Arm Length Stabilization using green laser beams = | |
| Line 10: | Line 9: |
| = Overview and Conceptual design = | = Overview = The diagrams below show a conceptual design |
| Line 15: | Line 16: |
| = plans = | |
| Line 16: | Line 18: |
| || || ''' action item list ''' || [:Upgrade 09/GreenLock/action_item_list] || ||<|15> ''' monthly plan ''' ||'''October 2010''' || [:Upgrade 09/GreenLock/October_2010] || ||'''November 2010''' || [:Upgrade 09/GreenLock/November_2010] || ||'''December 2010''' || [:Upgrade 09/GreenLock/December_2010] || |
|
| Line 17: | Line 23: |
| [[BR]] | |
| Line 18: | Line 25: |
| Optical Layout ([attachment:green_optics.png Table]/ In-vac) [[Upgrade 09/GreenLock/end table|ETM / end table]] <<ImageLink(endtable.jpg,Upgrade 09/GreenLock/end_table)>> [[Upgrade 09/Optical Layout#wedge|ITM wedge effect]] [[Upgrade 09/Optical Layout|Periscopes for beam steering from PR3/SR3 transmissions to the PSL viewport]] |
= developer's page = |
| Line 23: | Line 27: |
| Mode matching ([attachment:modematch_END.png mode matching at end table]) [[Upgrade 09/GreenLock/Electronics|Electronics]] [[Upgrade 09/GreenLock/Control Information|jump to Control Information]] |
||''' Optical Layout '''|| ([attachment:green_optics.png Table]/ In-vac) || || ''' end table ''' || [[Upgrade 09/GreenLock/end table|ETM / end table]] || || ''' end table ''' || <<ImageLink(endtable.jpg,Upgrade 09/GreenLock/end_table)>> || || ''' wedge effect ''' || [[Upgrade 09/Optical Layout#wedge|ITM wedge effect]] || || ''' in-vac ''' || [[Upgrade 09/Optical Layout|Periscopes for beam steering from PR3/SR3 transmissions to the PSL viewport]] || || ''' Mode matching ''' || ([attachment:modematch_END.png mode matching at end table]) || || ''' Electronics ''' || [:Upgrade 09/GreenLock/Electronics] || || ''' sensing and control ''' || [[Upgrade 09/GreenLock/Control Information|jump to Control Information]] || || ''' manual for the doubling oven ''' || [attachment:manual_oven.pdf manual for the covesion oven] || || ''' noise requirements ''' ||[:Upgrade 09/GreenLock/Noise Requirement] || || ''' purchase list ''' || [[Upgrade 09/Purchase List/Green Locking|Purchase list]] || |
| Line 38: | Line 45: |
| || ''' manual for the doubling oven ''' || [attachment:manual_oven.pdf manual for the covesion oven] || || ''' noise requirements ''' ||[:Upgrade 09/GreenLock/Noise Requirement] || || ''' purchase list ''' || [[Upgrade 09/Purchase List/Green Locking|Purchase list]] || |
- attachment:god_of_green.png
Overview
plans
|
action item list |
[:Upgrade 09/GreenLock/action_item_list] |
monthly plan |
October 2010 |
[:Upgrade 09/GreenLock/October_2010] |
November 2010 |
[:Upgrade 09/GreenLock/November_2010] |
|
December 2010 |
[:Upgrade 09/GreenLock/December_2010] |
developer's page
Optical Layout |
([attachment:green_optics.png Table]/ In-vac) |
end table |
|
end table |
|
wedge effect |
|
in-vac |
Periscopes for beam steering from PR3/SR3 transmissions to the PSL viewport |
Mode matching |
([attachment:modematch_END.png mode matching at end table]) |
Electronics |
[:Upgrade 09/GreenLock/Electronics] |
sensing and control |
|
manual for the doubling oven |
[attachment:manual_oven.pdf manual for the covesion oven] |
noise requirements |
[:Upgrade 09/GreenLock/Noise Requirement] |
purchase list |
links
aLIGO ALS wiki |
http://ilog.ligo-wa.caltech.edu:7285/advligo/Arm_Length_Stabilisation |
Description of the optical / servo configuration |
[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=6888 LIGO DCC] |
Servo modeling (SimLink) |
[https://nodus.ligo.caltech.edu:30889/svn/trunk/docs/upgrade08/Green_Locking/Servo_modeling/ 40mSVN] |