Differences between revisions 86 and 89 (spanning 3 versions)
Revision 86 as of 2010-07-13 03:16:41
Size: 3548
Editor: KiwamuIzumi
Comment:
Revision 89 as of 2010-07-13 03:20:39
Size: 3530
Editor: KiwamuIzumi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
[[BR]]
Line 4: Line 3:
 <<Anchor(TOP)>> .   attachment:green_man.jpg
[[BR]]
 <<Anchor(TOP)>>
. attachment:green_man.jpg
Line 11: Line 11:

''' Table of Contents '''
Line 76: Line 78:
 . B) [[Upgrade 09/GreenLock/Noise Requirement|jump to Noise Requirement]]  . {i} [[Upgrade 09/GreenLock/Noise Requirement|jump to Noise Requirement]]
Line 79: Line 81:
 . Description of the optical / servo configuration [https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=6888 LIGO DCC]
 . Servo modeling (!SimLink) [https://nodus.ligo.caltech.edu:30889/svn/trunk/docs/upgrade08/Green_Locking/Servo_modeling/ 40mSVN]
 . {i} Description of the optical / servo configuration [https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=6888 LIGO DCC]
 . {i} Servo modeling (!SimLink) [https://nodus.ligo.caltech.edu:30889/svn/trunk/docs/upgrade08/Green_Locking/Servo_modeling/ 40mSVN]
Line 82: Line 84:
 . [#TOP back to the page top]
<<I
mageLink(god_of_green.png,#TOP,width=80[,height=90]][,alt=alttag])>>
 . {i} [#TOP back to the page top] attachment:god_of_green.png

Arm Length Stabilization using green laser beams

  • attachment:green_man.jpg
    • We are developing a technique of Arm Length Stabilization (ALS) for advanced LIGO. The technique employs two auxiliary green lasers at each end of the arm. Basically these lasers are able to sense the displacement of the each arm independently on the main laser, eventually make full lock acquisition of advanced interferometer more robust and reliable.

BR BR

Table of Contents

<<TableOfContents: execution failed [Argument "maxdepth" must be an integer value, not "[2]"] (see also the log)>>

BR


Designs and Plans

time line

  • The time line describes where we are now and where we go. B) time line

Conceptual design

Green Preliminary Design

  • green_vertex_preliminary_design.png green_ETM_preliminary_design.png

BR


Installation status

BR


Advanced_Techniques/Green_Locking (last edited 2015-06-23 03:44:00 by EricquinteroATligoDOTorg)