Differences between revisions 82 and 85 (spanning 3 versions)
Revision 82 as of 2010-07-13 03:08:22
Size: 3161
Editor: KiwamuIzumi
Comment:
Revision 85 as of 2010-07-13 03:12:22
Size: 3486
Editor: KiwamuIzumi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 35: Line 35:
[[BR]]

-------
Line 65: Line 68:
 . B) [[Upgrade 09/GreenLock/Control Information|jump to Control Information]]
Line 66: Line 70:
== Control information ==
 . B) [[Upgrade 09/GreenLock/Control Information|jump to Control Information]]
[[BR]]

-------
Line 74: Line 79:
 . Description of the optical / servo configuration [https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=6888 LIGO DCC]
 . Servo modeling (!SimLink) [https://nodus.ligo.caltech.edu:30889/svn/trunk/docs/upgrade08/Green_Locking/Servo_modeling/ 40mSVN]

[[GreenLock|back to the top]]
attachment:god_of_green.png

Arm Length Stabilization using green laser beams

BR

  • attachment:green_man.jpg

BR

  • We are developing a technique of Arm Length Stabilization (ALS) for advanced LIGO. The technique employs two auxiliary green lasers at each end of the arm. Basically these lasers are able to sense the displacement of the each arm independently on the main laser, eventually make full lock acquisition of advanced interferometer more robust and reliable.

BR BR

<<TableOfContents: execution failed [Argument "maxdepth" must be an integer value, not "[2]"] (see also the log)>>

BR


Designs and Plans

time line

  • The time line describes where we are now and where we go. B) time line

Conceptual design

Green Preliminary Design

  • green_vertex_preliminary_design.png green_ETM_preliminary_design.png

BR


Installation status

BR


back to the top attachment:god_of_green.png

Advanced_Techniques/Green_Locking (last edited 2015-06-23 03:44:00 by EricquinteroATligoDOTorg)