Differences between revisions 81 and 90 (spanning 9 versions)
Revision 81 as of 2010-07-13 03:06:35
Size: 3183
Editor: KiwamuIzumi
Comment:
Revision 90 as of 2010-07-13 03:22:39
Size: 3790
Editor: KiwamuIzumi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
[[BR]]
Line 4: Line 3:
  .   attachment:green_man.jpg
[[BR]]
 <<Anchor(TOP)>>
 
. attachment:green_man.jpg
Line 11: Line 11:

''' Table of Contents '''
Line 23: Line 25:
 * '''Design and Purchasing Lists'''
  * Optical design / [[Upgrade 09/Purchase List/Green Locking|item list]]
  * Electronics / control design / [[Upgrade 09/Purchase List/Green Locking|item list]]
  * [[Upgrade 09/Purchase List/Green Locking|Purchase list]]
Line 35: Line 41:
[[BR]]

-------
Line 37: Line 46:
== Detailed design ==
Line 66: Line 74:
 . B) [[Upgrade 09/GreenLock/Control Information|jump to Control Information]]
Line 67: Line 76:
== Control information ==
 . B) [[Upgrade 09/GreenLock/Control Information|jump to Control Information]]
[[BR]]

-------
Line 72: Line 82:
 . B) [[Upgrade 09/GreenLock/Noise Requirement|jump to Noise Requirement]]  . {i} [[Upgrade 09/GreenLock/Noise Requirement|jump to Noise Requirement]]
Line 75: Line 85:
 . {i} Description of the optical / servo configuration [https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=6888 LIGO DCC]
 . {i} Servo modeling (!SimLink) [https://nodus.ligo.caltech.edu:30889/svn/trunk/docs/upgrade08/Green_Locking/Servo_modeling/ 40mSVN]

 . {i} [#TOP back to the page top] attachment:god_of_green.png

Arm Length Stabilization using green laser beams

  • attachment:green_man.jpg
    • We are developing a technique of Arm Length Stabilization (ALS) for advanced LIGO. The technique employs two auxiliary green lasers at each end of the arm. Basically these lasers are able to sense the displacement of the each arm independently on the main laser, eventually make full lock acquisition of advanced interferometer more robust and reliable.

BR BR

Table of Contents

<<TableOfContents: execution failed [Argument "maxdepth" must be an integer value, not "[2]"] (see also the log)>>

BR


Designs and Plans

time line

Conceptual design

Green Preliminary Design

  • green_vertex_preliminary_design.png green_ETM_preliminary_design.png

BR


Installation status

BR


Advanced_Techniques/Green_Locking (last edited 2015-06-23 03:44:00 by EricquinteroATligoDOTorg)