Differences between revisions 81 and 87 (spanning 6 versions)
Revision 81 as of 2010-07-13 03:06:35
Size: 3183
Editor: KiwamuIzumi
Comment:
Revision 87 as of 2010-07-13 03:18:02
Size: 3498
Editor: KiwamuIzumi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:

 <<Anchor(TOP)>>
 . attachment:green_man.jpg
Line 4: Line 8:
  . attachment:green_man.jpg
[[BR]]
Line 35: Line 37:
[[BR]]

-------
Line 37: Line 42:
== Detailed design ==
Line 66: Line 70:
 . B) [[Upgrade 09/GreenLock/Control Information|jump to Control Information]]
Line 67: Line 72:
== Control information ==
 . B) [[Upgrade 09/GreenLock/Control Information|jump to Control Information]]
[[BR]]

-------
Line 75: Line 81:
 . Description of the optical / servo configuration [https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=6888 LIGO DCC]
 . Servo modeling (!SimLink) [https://nodus.ligo.caltech.edu:30889/svn/trunk/docs/upgrade08/Green_Locking/Servo_modeling/ 40mSVN]

 . [#TOP back to the page top] attachment:god_of_green.png

Arm Length Stabilization using green laser beams

  • attachment:green_man.jpg

BR

  • We are developing a technique of Arm Length Stabilization (ALS) for advanced LIGO. The technique employs two auxiliary green lasers at each end of the arm. Basically these lasers are able to sense the displacement of the each arm independently on the main laser, eventually make full lock acquisition of advanced interferometer more robust and reliable.

BR BR

<<TableOfContents: execution failed [Argument "maxdepth" must be an integer value, not "[2]"] (see also the log)>>

BR


Designs and Plans

time line

  • The time line describes where we are now and where we go. B) time line

Conceptual design

Green Preliminary Design

  • green_vertex_preliminary_design.png green_ETM_preliminary_design.png

BR


Installation status

BR


Advanced_Techniques/Green_Locking (last edited 2015-06-23 03:44:00 by EricquinteroATligoDOTorg)