Differences between revisions 81 and 82
Revision 81 as of 2010-07-13 03:06:35
Size: 3183
Editor: KiwamuIzumi
Comment:
Revision 82 as of 2010-07-13 03:08:22
Size: 3161
Editor: KiwamuIzumi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 37: Line 37:
== Detailed design ==

Arm Length Stabilization using green laser beams

BR

  • attachment:green_man.jpg

BR

  • We are developing a technique of Arm Length Stabilization (ALS) for advanced LIGO. The technique employs two auxiliary green lasers at each end of the arm. Basically these lasers are able to sense the displacement of the each arm independently on the main laser, eventually make full lock acquisition of advanced interferometer more robust and reliable.

BR BR

<<TableOfContents: execution failed [Argument "maxdepth" must be an integer value, not "[2]"] (see also the log)>>

BR


Designs and Plans

time line

  • The time line describes where we are now and where we go. B) time line

Conceptual design

Green Preliminary Design

  • green_vertex_preliminary_design.png green_ETM_preliminary_design.png

Installation status

Control information

Advanced_Techniques/Green_Locking (last edited 2015-06-23 03:44:00 by EricquinteroATligoDOTorg)