Line 35: Line 35:
[[BR]]
Line 36: Line 37:
=== Development roadmap ===
 * '''End table arrangement'''
  * NPRO placement / optical assembly at the end

  * SHG at the end table
  * Control system placement
  * Coarse/fine alignment to the cavity
  * Lock of the green beam to the cavity
 * '''At the PSL table'''
  * SHG at the PSL table
 * '''Digital control'''
  * Virtual Green lock by RCG
  * GPIB interfaces
 * '''Vertex tank optical arrangement'''
  * In-vac steering (PO transmission / Periscope / Mirrors)
  * Vertex phase noise measurement
   * Electronics placement
   * Control system implementation
 * '''Performance evaluation'''
  * f_noise of green beam / PDH performance

  * Relative f_noise between the PSL green and the Arm transmitted green
  * ALS performance
 * '''Sophistication of the scheme'''
  * Automatic handing off scripts

  * Ready-to-go panels for AdvLIGO
  * Automatic alignment of the green beam
  * Green Michelson for precise ETM calibration

  * Absolute length / mode spacing measurement by green''' '''
-------
Line 70: Line 40:
== Detailed design ==
Line 99: Line 68:
 . B) [[Upgrade 09/GreenLock/Control Information|jump to Control Information]]
Line 100: Line 70:
== Control information ==
 . B) [[Upgrade 09/GreenLock/Control Information|jump to Control Information]]
[[BR]]

-------
Line 108: Line 79:
 . Description of the optical / servo configuration [https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=6888 LIGO DCC]
 . Servo modeling (!SimLink) [https://nodus.ligo.caltech.edu:30889/svn/trunk/docs/upgrade08/Green_Locking/Servo_modeling/ 40mSVN]

Arm Length Stabilization using green laser beams

BR

  • attachment:green_man.jpg

BR

  • We are developing a technique of Arm Length Stabilization (ALS) for advanced LIGO. The technique employs two auxiliary green lasers at each end of the arm. Basically these lasers are able to sense the displacement of the each arm independently on the main laser, eventually make full lock acquisition of advanced interferometer more robust and reliable.

BR BR

<<TableOfContents: execution failed [Argument "maxdepth" must be an integer value, not "[2]"] (see also the log)>>

BR


Designs and Plans

time line

  • The time line describes where we are now and where we go. B) time line

Conceptual design

Green Preliminary Design

  • green_vertex_preliminary_design.png green_ETM_preliminary_design.png

BR


Installation status

BR


Advanced_Techniques/Green_Locking (last edited 2015-06-23 03:44:00 by EricquinteroATligoDOTorg)