Differences between revisions 78 and 95 (spanning 17 versions)
Revision 78 as of 2010-04-28 04:01:22
Size: 4139
Editor: KiwamuIzumi
Comment:
Revision 95 as of 2010-10-05 20:11:06
Size: 1767
Editor: KiwamuIzumi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= Arm Length Stabilization by injecting green laser beams from the arm ends =
[[BR]]
<<Anchor(TOP)>>
Line 4: Line 3:
  . attachment:green_man.jpg
[[BR]]

   . We are developing a technique of Arm Length Stabilization (ALS) for advanced LIGO. The technique employs two auxiliary green lasers at each end of the arm. Basically these lasers are able to sense the displacement of the each arm independently on the main laser, eventually make full lock acquisition of advanced interferometer more robust and reliable.

[[BR]]
[[BR]]

<<TableOfContents([2])>>

[[BR]]

{i} aLIGO ALS wiki http://ilog.ligo-wa.caltech.edu:7285/advligo/Arm_Length_Stabilisation

[[BR]]
[[BR]]

-------

== Plan ==
=== time line ===
 * The time line describes where we are now and where we go. B) [[Upgrade 09/GreenLock/timeline|time line]]


=== Conceptual design ===
 * Description of the optical / servo configuration [https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=6888 LIGO DCC]
 * Servo modeling (!SimLink) [https://nodus.ligo.caltech.edu:30889/svn/trunk/docs/upgrade08/Green_Locking/Servo_modeling/ 40mSVN]


==== Green Preliminary Design ====
   . <<ImageLink(green_vertex_preliminary_design.png,Upgrade 09/GreenLock/Preliminary design for the vertex,height=200)>>
   <<ImageLink(green_ETM_preliminary_design.png,Upgrade 09/GreenLock/Preliminary design for the end,height=200)>>
   . attachment:god_of_green.png
Line 40: Line 9:
=== Development roadmap ===
 * '''End table arrangement'''
  * NPRO placement / optical assembly at the end
= Overview and Conceptual design =
Line 44: Line 11:
  * SHG at the end table
  * Control system placement
  * Coarse/fine alignment to the cavity
  * Lock of the green beam to the cavity
 * '''At the PSL table'''
  * SHG at the PSL table
 * '''Digital control'''
  * Virtual Green lock by RCG
  * GPIB interfaces
 * '''Vertex tank optical arrangement'''
  * In-vac steering (PO transmission / Periscope / Mirrors)
  * Vertex phase noise measurement
   * Electronics placement
   * Control system implementation
 * '''Performance evaluation'''
  * f_noise of green beam / PDH performance
   <<ImageLink(green_vertex_preliminary_design.png,Upgrade 09/GreenLock/Preliminary design for the vertex,height=200)>>
   <<ImageLink(green_ETM_preliminary_design.png,Upgrade 09/GreenLock/Preliminary design for the end,height=200)>>
Line 61: Line 14:
  * Relative f_noise between the PSL green and the Arm transmitted green
  * ALS performance
 * '''Sophistication of the scheme'''
  * Automatic handing off scripts
= plans =
Line 66: Line 16:
  * Ready-to-go panels for AdvLIGO
  * Automatic alignment of the green beam
  * Green Michelson for precise ETM calibration
[[BR]]
Line 70: Line 18:
  * Absolute length / mode spacing measurement by green''' ''' = developer's page =

||''' Optical Layout '''|| ([attachment:green_optics.png Table]/ In-vac) ||
|| ''' end table ''' || [[Upgrade 09/GreenLock/end table|ETM / end table]] ||
|| ''' end table ''' || <<ImageLink(endtable.jpg,Upgrade 09/GreenLock/end_table)>> ||
|| ''' wedge effect ''' || [[Upgrade 09/Optical Layout#wedge|ITM wedge effect]] ||
|| ''' in-vac ''' || [[Upgrade 09/Optical Layout|Periscopes for beam steering from PR3/SR3 transmissions to the PSL viewport]] ||
|| ''' Mode matching ''' || ([attachment:modematch_END.png mode matching at end table]) ||
|| ''' Electronics ''' || [:Upgrade 09/GreenLock/Electronics] ||
|| ''' sensing and control ''' || [[Upgrade 09/GreenLock/Control Information|jump to Control Information]] ||
  
Line 73: Line 31:

== Detailed design ==
 * '''Design and Purchasing Lists'''
  * Optical design / [[Upgrade 09/Purchase List/Green Locking|item list]]
  * Electronics / control design / [[Upgrade 09/Purchase List/Green Locking|item list]]
  * [[Upgrade 09/Purchase List/Green Locking|Purchase list]]
 * '''Detailed considerations'''
  * Optical Layout ([attachment:green_optics.png Table]/ In-vac)
   * [[Upgrade 09/GreenLock/end table|ETM / end table]] <<ImageLink(endtable.jpg,Upgrade 09/GreenLock/end_table)>>
   * [[Upgrade 09/Optical Layout#wedge|ITM wedge effect]]
   * [[Upgrade 09/Optical Layout|Periscopes for beam steering from PR3/SR3 transmissions to the PSL viewport]]
   * PSL viewport modification (viewport cover / tube / PSL box / periscope on the PSL table)
   * PSL table
   * Laser & SHG specs --- power, polarization, Xtals
    . '' - references''
    . [1] G.D.Boyd and D.A. Kleinman, [http://jap.aip.org/japiau/v39/i8/p3597_s1 "Parametric interaction of Focused Gaussian Light Beams", J.A. Phys. 39, 3597 (1968)]

    . [2] C. Zhang, Y.Qin and Y.Zhu, [http://www.opticsinfobase.org/ol/abstract.cfm?uri=ol-33-7-720 "Perfect quasi-phase matching for the third-harmonic generation using focused Gaussian beams",Opt. Lett. 33, 720 (2008)]

  * Main optics specs (review)
  * Mode matching ([attachment:modematch_END.png mode matching at end table])
  * Green generation
   . [attachment:manual_oven.pdf manual for the covesion oven]
  * Expected performance / noise / control system range
  * Digital servo / operation
  * Alignment (initial / fine / automatic)



== Control information ==
 . B) [[Upgrade 09/GreenLock/Control Information|jump to Control Information]]


== Noise Requirements ==
  . B) [[Upgrade 09/GreenLock/Noise Requirement|jump to Noise Requirement]]
= links =
|| ''' aLIGO ALS wiki ''' || http://ilog.ligo-wa.caltech.edu:7285/advligo/Arm_Length_Stabilisation ||
|| ''' Description of the optical / servo configuration ''' || [https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=6888 LIGO DCC] ||
|| ''' Servo modeling (!SimLink) ''' || [https://nodus.ligo.caltech.edu:30889/svn/trunk/docs/upgrade08/Green_Locking/Servo_modeling/ 40mSVN] ||
|| ''' manual for the doubling oven ''' || [attachment:manual_oven.pdf manual for the covesion oven] ||
|| ''' noise requirements ''' ||[:Upgrade 09/GreenLock/Noise Requirement] ||
|| ''' purchase list ''' || [[Upgrade 09/Purchase List/Green Locking|Purchase list]] ||

  • attachment:god_of_green.png

Overview and Conceptual design

  • green_vertex_preliminary_design.png green_ETM_preliminary_design.png

plans

BR

developer's page

Optical Layout

([attachment:green_optics.png Table]/ In-vac)

end table

ETM / end table

end table

endtable.jpg

wedge effect

ITM wedge effect

in-vac

Periscopes for beam steering from PR3/SR3 transmissions to the PSL viewport

Mode matching

([attachment:modematch_END.png mode matching at end table])

Electronics

[:Upgrade 09/GreenLock/Electronics]

sensing and control

jump to Control Information

links

aLIGO ALS wiki

http://ilog.ligo-wa.caltech.edu:7285/advligo/Arm_Length_Stabilisation

Description of the optical / servo configuration

[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=6888 LIGO DCC]

Servo modeling (SimLink)

[https://nodus.ligo.caltech.edu:30889/svn/trunk/docs/upgrade08/Green_Locking/Servo_modeling/ 40mSVN]

manual for the doubling oven

[attachment:manual_oven.pdf manual for the covesion oven]

noise requirements

[:Upgrade 09/GreenLock/Noise Requirement]

purchase list

Purchase list

Advanced_Techniques/Green_Locking (last edited 2015-06-23 03:44:00 by EricquinteroATligoDOTorg)