Differences between revisions 77 and 90 (spanning 13 versions)
Revision 77 as of 2010-04-27 23:59:36
Size: 4139
Editor: KiwamuIzumi
Comment:
Revision 90 as of 2010-07-13 03:22:39
Size: 3790
Editor: KiwamuIzumi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= Arm Length Stabilization by injecting green laser beams from the arm ends =
[[BR]]
= Arm Length Stabilization using green laser beams =
Line 4: Line 3:
  .   attachment:green_man.jpg
[[BR]]
 <<Anchor(TOP)>>
 
. attachment:green_man.jpg
Line 7: Line 6:
   . We are developing a technique of Arm Length Stabilization (ASL) for advanced LIGO. The technique employs two auxiliary green lasers at each end of the arm. Basically these lasers are able to sense the displacement of the each arm independently on the main laser, eventually make full lock acquisition of advanced interferometer more robust and reliable.
. We are developing a technique of Arm Length Stabilization (ALS) for advanced LIGO. The technique employs two auxiliary green lasers at each end of the arm. Basically these lasers are able to sense the displacement of the each arm independently on the main laser, eventually make full lock acquisition of advanced interferometer more robust and reliable.
Line 11: Line 11:

''' Table of Contents '''
Line 16: Line 18:
{i} aLIGO ALS wiki http://ilog.ligo-wa.caltech.edu:7285/advligo/Arm_Length_Stabilisation

[[BR]]
[[BR]]
Line 23: Line 21:
== Plan == == Designs and Plans ==
Line 27: Line 25:
 * '''Design and Purchasing Lists'''
  * Optical design / [[Upgrade 09/Purchase List/Green Locking|item list]]
  * Electronics / control design / [[Upgrade 09/Purchase List/Green Locking|item list]]
  * [[Upgrade 09/Purchase List/Green Locking|Purchase list]]
Line 39: Line 41:
[[BR]]
Line 40: Line 43:
=== Development roadmap ===
 * '''End table arrangement'''
  * NPRO placement / optical assembly at the end
-------
== Installation status ==
Line 44: Line 46:
  * SHG at the end table
  * Control system placement
  * Coarse/fine alignment to the cavity
  * Lock of the green beam to the cavity
 * '''At the PSL table'''
  * SHG at the PSL table
 * '''Digital control'''
  * Virtual Green lock by RCG
  * GPIB interfaces
 * '''Vertex tank optical arrangement'''
  * In-vac steering (PO transmission / Periscope / Mirrors)
  * Vertex phase noise measurement
   * Electronics placement
   * Control system implementation
 * '''Performance evaluation'''
  * f_noise of green beam / PDH performance

  * Relative f_noise between the PSL green and the Arm transmitted green
  * ALS performance
 * '''Sophistication of the scheme'''
  * Automatic handing off scripts

  * Ready-to-go panels for AdvLIGO
  * Automatic alignment of the green beam
  * Green Michelson for precise ETM calibration

  * Absolute length / mode spacing measurement by green''' '''



== Detailed design ==
Line 97: Line 68:
  * B) [[Upgrade 09/GreenLock/Electronics|Electronics]]
 
Line 101: Line 74:

== Control information ==
Line 105: Line 76:
[[BR]]
Line 106: Line 78:
== Noise Requirements ==
  . B) [[Upgrade 09/GreenLock/Noise Requirement|jump to Noise Requirement]]
-------


== Links ==
 . {i} [[Upgrade 09/GreenLock/Noise Requirement|jump to Noise Requirement]]

 . {i} aLIGO ALS wiki http://ilog.ligo-wa.caltech.edu:7285/advligo/Arm_Length_Stabilisation
 . {i} Description of the optical / servo configuration [https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=6888 LIGO DCC]
 . {i} Servo modeling (!SimLink) [https://nodus.ligo.caltech.edu:30889/svn/trunk/docs/upgrade08/Green_Locking/Servo_modeling/ 40mSVN]

 . {i} [#TOP back to the page top] attachment:god_of_green.png

Arm Length Stabilization using green laser beams

  • attachment:green_man.jpg
    • We are developing a technique of Arm Length Stabilization (ALS) for advanced LIGO. The technique employs two auxiliary green lasers at each end of the arm. Basically these lasers are able to sense the displacement of the each arm independently on the main laser, eventually make full lock acquisition of advanced interferometer more robust and reliable.

BR BR

Table of Contents

<<TableOfContents: execution failed [Argument "maxdepth" must be an integer value, not "[2]"] (see also the log)>>

BR


Designs and Plans

time line

Conceptual design

Green Preliminary Design

  • green_vertex_preliminary_design.png green_ETM_preliminary_design.png

BR


Installation status

BR


Advanced_Techniques/Green_Locking (last edited 2015-06-23 03:44:00 by EricquinteroATligoDOTorg)