= Arm Length Stabilization by injecting green laser beams from the arm ends =
[[BR]]
[[BR]]
<<Anchor(TOP)>>
Line 5: Line 3:

<<TableOfContents([2])>>

[[BR]]

{i} aLIGO ALS wiki http://ilog.ligo-wa.caltech.edu:7285/advligo/Arm_Length_Stabilisation

[[BR]]
[[BR]]

-------

== Plan ==
=== time line ===
 * [[Upgrade 09/GreenLock/timeline|time line]] describes where we are now and where we go.


=== Conceptual design ===
 * Description of the optical / servo configuration [https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=6888 LIGO DCC]
 * Servo modeling (!SimLink) [https://nodus.ligo.caltech.edu:30889/svn/trunk/docs/upgrade08/Green_Locking/Servo_modeling/ 40mSVN]


==== Green Preliminary Design ====
   . <<ImageLink(green_vertex_preliminary_design.png,Upgrade 09/GreenLock/Preliminary design for the vertex,height=200)>>
   <<ImageLink(green_ETM_preliminary_design.png,Upgrade 09/GreenLock/Preliminary design for the end,height=200)>>
   . attachment:god_of_green.png
Line 34: Line 9:
=== Development roadmap ===
 * '''End table arrangement'''
  * NPRO placement / optical assembly at the end
= Overview and Conceptual design =
Line 38: Line 11:
  * SHG at the end table
  * Control system placement
  * Coarse alignment to the cavity
  * Fine alignment
  * Lock of the green beam to the cavity
 * '''At the PSL table'''
  * SHG at the PSL table
 * '''Digital control'''
  * Virtual Green lock by RCG
  * GPIB interfaces
 * '''Vertex tank optical arrangement'''
  * In-vac steering (PO transmission / Periscope / Mirrors)
  * Vertex phase noise measurement
   * Electronics placement
   * Control system implementation
 * '''Performance evaluation'''
  * f_noise of green beam / PDH performance
   <<ImageLink(green_vertex_preliminary_design.png,Upgrade 09/GreenLock/Preliminary design for the vertex,height=200)>>
   <<ImageLink(green_ETM_preliminary_design.png,Upgrade 09/GreenLock/Preliminary design for the end,height=200)>>
Line 56: Line 14:
  * Relative f_noise between the PSL green and the Arm transmitted green
  * ALS performance
 * '''Sophistication of the scheme'''
  * Automatic handing off scripts
= plans =
Line 61: Line 16:
  * Ready-to-go panels for AdvLIGO
  * Automatic alignment of the green beam
  * ---
  * Green Michelson for precise ETM calibration
|| || ''' action item list ''' || [:Upgrade 09/GreenLock/action_item_list] ||
||<|15> ''' monthly plan ''' ||'''October 2010''' || [:Upgrade 09/GreenLock/October_2010] ||
||'''November 2010''' || [:Upgrade 09/GreenLock/November_2010] ||
||'''December 2010''' || [:Upgrade 09/GreenLock/December_2010] ||
Line 66: Line 21:
  * Absolute length / mode spacing measurement by green''' ''' [[BR]]

= developer's page =

||''' Optical Layout '''|| ([attachment:green_optics.png Table]/ In-vac) ||
|| ''' end table ''' || [[Upgrade 09/GreenLock/end table|ETM / end table]] ||
|| ''' end table ''' || <<ImageLink(endtable.jpg,Upgrade 09/GreenLock/end_table)>> ||
|| ''' wedge effect ''' || [[Upgrade 09/Optical Layout#wedge|ITM wedge effect]] ||
|| ''' in-vac ''' || [[Upgrade 09/Optical Layout|Periscopes for beam steering from PR3/SR3 transmissions to the PSL viewport]] ||
|| ''' Mode matching ''' || ([attachment:modematch_END.png mode matching at end table]) ||
|| ''' Electronics ''' || [:Upgrade 09/GreenLock/Electronics] ||
|| ''' sensing and control ''' || [[Upgrade 09/GreenLock/Control Information|jump to Control Information]] ||
|| ''' manual for the doubling oven ''' || [attachment:manual_oven.pdf manual for the covesion oven] ||
|| ''' noise requirements ''' ||[:Upgrade 09/GreenLock/Noise Requirement] ||
|| ''' purchase list ''' || [[Upgrade 09/Purchase List/Green Locking|Purchase list]] ||
  
Line 69: Line 39:

== Detailed design ==
 * '''Design and Purchasing Lists'''
  * Optical design / [[Upgrade 09/Purchase List/Green Locking|item list]]
  * Electronics / control design / [[Upgrade 09/Purchase List/Green Locking|item list]]
  * [[Upgrade 09/Purchase List/Green Locking|Purchase list]]
 * '''Detailed considerations'''
  * Optical Layout ([attachment:green_optics.png Table]/ In-vac)
   * [[Upgrade 09/GreenLock/end table|ETM / end table]] <<ImageLink(endtable.jpg,Upgrade 09/GreenLock/end_table)>>
   * [[Upgrade 09/Optical Layout#wedge|ITM wedge effect]]
   * [[Upgrade 09/Optical Layout|Periscopes for beam steering from PR3/SR3 transmissions to the PSL viewport]]
   * PSL viewport modification (viewport cover / tube / PSL box / periscope on the PSL table)
   * PSL table
   * Laser & SHG specs --- power, polarization, Xtals
    . '' - references''
    . [1] G.D.Boyd and D.A. Kleinman, [http://jap.aip.org/japiau/v39/i8/p3597_s1 "Parametric interaction of Focused Gaussian Light Beams", J.A. Phys. 39, 3597 (1968)]

    . [2] C. Zhang, Y.Qin and Y.Zhu, [http://www.opticsinfobase.org/ol/abstract.cfm?uri=ol-33-7-720 "Perfect quasi-phase matching for the third-harmonic generation using focused Gaussian beams",Opt. Lett. 33, 720 (2008)]

  * Main optics specs (review)
  * Mode matching ([attachment:modematch_END.png mode matching at end table])
  * Green generation
   . [attachment:manual_oven.pdf manual for the covesion oven]
  * Expected performance / noise / control system range
  * Digital servo / operation
  * Alignment (initial / fine / automatic)



== Control information ==
 . B) [[Upgrade 09/GreenLock/Control Information|jump to Control Information]]


== Noise Requirements ==
  . B) [[Upgrade 09/GreenLock/Noise Requirement|jump to Noise Requirement]]
= links =
|| ''' aLIGO ALS wiki ''' || http://ilog.ligo-wa.caltech.edu:7285/advligo/Arm_Length_Stabilisation ||
|| ''' Description of the optical / servo configuration ''' || [https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=6888 LIGO DCC] ||
|| ''' Servo modeling (!SimLink) ''' || [https://nodus.ligo.caltech.edu:30889/svn/trunk/docs/upgrade08/Green_Locking/Servo_modeling/ 40mSVN] ||

  • attachment:god_of_green.png

Overview and Conceptual design

  • green_vertex_preliminary_design.png green_ETM_preliminary_design.png

plans

action item list

[:Upgrade 09/GreenLock/action_item_list]

monthly plan

October 2010

[:Upgrade 09/GreenLock/October_2010]

November 2010

[:Upgrade 09/GreenLock/November_2010]

December 2010

[:Upgrade 09/GreenLock/December_2010]

BR

developer's page

Optical Layout

([attachment:green_optics.png Table]/ In-vac)

end table

ETM / end table

end table

endtable.jpg

wedge effect

ITM wedge effect

in-vac

Periscopes for beam steering from PR3/SR3 transmissions to the PSL viewport

Mode matching

([attachment:modematch_END.png mode matching at end table])

Electronics

[:Upgrade 09/GreenLock/Electronics]

sensing and control

jump to Control Information

manual for the doubling oven

[attachment:manual_oven.pdf manual for the covesion oven]

noise requirements

[:Upgrade 09/GreenLock/Noise Requirement]

purchase list

Purchase list

links

aLIGO ALS wiki

http://ilog.ligo-wa.caltech.edu:7285/advligo/Arm_Length_Stabilisation

Description of the optical / servo configuration

[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=6888 LIGO DCC]

Servo modeling (SimLink)

[https://nodus.ligo.caltech.edu:30889/svn/trunk/docs/upgrade08/Green_Locking/Servo_modeling/ 40mSVN]

Advanced_Techniques/Green_Locking (last edited 2015-06-23 03:44:00 by EricquinteroATligoDOTorg)