Differences between revisions 71 and 92 (spanning 21 versions)
Revision 71 as of 2010-04-27 22:42:15
Size: 3728
Editor: KiwamuIzumi
Comment:
Revision 92 as of 2010-10-05 19:15:09
Size: 1769
Editor: KiwamuIzumi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= Arm Length Stabilization by injecting green laser beams from the arm  ends =
[[BR]]
[[BR]]
<<Anchor(TOP)>>
= Arm Length Stabilization using green laser beams =


 .
attachment:god_of_green.png
Line 6: Line 8:
<<TableOfContents([2])>>   * [[Upgrade 09/Purchase List/Green Locking|Purchase list]]
Line 8: Line 10:
[[BR]]

{i} aLIGO ALS wiki http://ilog.ligo-wa.caltech.edu:7285/advligo/Arm_Length_Stabilisation
[[BR]]
-------

== Plan ==
=== time line ===
 * [[Upgrade 09/GreenLock/timeline|time line]] describes where we are now and where we go.


=== Conceptual design ===
Line 23: Line 13:

==== Green Preliminary Design ====
Line 30: Line 18:

=== Development roadmap ===
 * '''End table arrangement'''
  * NPRO placement / optical assembly at the end

  * SHG at the end table
  * Control system placement
  * Coarse alignment to the cavity
  * Fine alignment
  * Lock of the green beam to the cavity
 * '''At the PSL table'''
  * SHG at the PSL table
 * '''Digital control'''
  * Virtual Green lock by RCG
  * GPIB interfaces
 * '''Vertex tank optical arrangement'''
  * In-vac steering (PO transmission / Periscope / Mirrors)
  * Vertex phase noise measurement
   * Electronics placement
   * Control system implementation
 * '''Performance evaluation'''
  * f_noise of green beam / PDH performance

  * Relative f_noise between the PSL green and the Arm transmitted green
  * ALS performance
 * '''Sophistication of the scheme'''
  * Automatic handing off scripts

  * Ready-to-go panels for AdvLIGO
  * Automatic alignment of the green beam
  * ---
  * Green Michelson for precise ETM calibration

  * Absolute length / mode spacing measurement by green''' '''



== Detailed design ==
 * '''Design and Purchasing Lists'''
  * Optical design / [[Upgrade 09/Purchase List/Green Locking|item list]]
  * Electronics / control design / [[Upgrade 09/Purchase List/Green Locking|item list]]
  * [[Upgrade 09/Purchase List/Green Locking|Purchase list]]
 * '''Detailed considerations'''
Line 77: Line 22:
   * PSL viewport modification (viewport cover / tube / PSL box / periscope on the PSL table)
   * PSL table
   * Laser & SHG specs --- power, polarization, Xtals
    . '' - references''
    . [1] G.D.Boyd and D.A. Kleinman, [http://jap.aip.org/japiau/v39/i8/p3597_s1 "Parametric interaction of Focused Gaussian Light Beams", J.A. Phys. 39, 3597 (1968)]
Line 83: Line 23:
    . [2] C. Zhang, Y.Qin and Y.Zhu, [http://www.opticsinfobase.org/ol/abstract.cfm?uri=ol-33-7-720 "Perfect quasi-phase matching for the third-harmonic generation using focused Gaussian beams",Opt. Lett. 33, 720 (2008)]

  * Main optics specs (review)
Line 89: Line 26:
  * Expected performance / noise / control system range
  * Digital servo / operation
  * Alignment (initial / fine / automatic)
  * B) [[Upgrade 09/GreenLock/Electronics|Electronics]]
 
 
Line 93: Line 30:
 . B) [[Upgrade 09/GreenLock/Control Information|jump to Control Information]]
 . {i} [[Upgrade 09/GreenLock/Noise Requirement|jump to Noise Requirement]]
Line 94: Line 33:
 . {i} aLIGO ALS wiki http://ilog.ligo-wa.caltech.edu:7285/advligo/Arm_Length_Stabilisation
 . {i} Description of the optical / servo configuration [https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=6888 LIGO DCC]
 . {i} Servo modeling (!SimLink) [https://nodus.ligo.caltech.edu:30889/svn/trunk/docs/upgrade08/Green_Locking/Servo_modeling/ 40mSVN]
Line 95: Line 37:
== Control information ==
 . B) [[Upgrade 09/GreenLock/Control Information|jump to Control Information]]


== Noise Requirements ==
  . B) [[Upgrade 09/GreenLock/Noise Requirement|jump to Noise Requirement]]
 

Arm Length Stabilization using green laser beams

Advanced_Techniques/Green_Locking (last edited 2015-06-23 03:44:00 by EricquinteroATligoDOTorg)