Differences between revisions 71 and 72
Revision 71 as of 2010-04-27 22:42:15
Size: 3728
Editor: KiwamuIzumi
Comment:
Revision 72 as of 2010-04-27 22:42:32
Size: 3737
Editor: KiwamuIzumi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
Line 12: Line 13:
[[BR]]

Arm Length Stabilization by injecting green laser beams from the arm ends

BR BR

<<TableOfContents: execution failed [Argument "maxdepth" must be an integer value, not "[2]"] (see also the log)>>

BR

{i} aLIGO ALS wiki http://ilog.ligo-wa.caltech.edu:7285/advligo/Arm_Length_Stabilisation

BR BR


Plan

time line

  • time line describes where we are now and where we go.

Conceptual design

Green Preliminary Design

  • green_vertex_preliminary_design.png green_ETM_preliminary_design.png

Development roadmap

  • End table arrangement

    • NPRO placement / optical assembly at the end
    • SHG at the end table
    • Control system placement
    • Coarse alignment to the cavity
    • Fine alignment
    • Lock of the green beam to the cavity
  • At the PSL table

    • SHG at the PSL table
  • Digital control

    • Virtual Green lock by RCG
    • GPIB interfaces
  • Vertex tank optical arrangement

    • In-vac steering (PO transmission / Periscope / Mirrors)
    • Vertex phase noise measurement
      • Electronics placement
      • Control system implementation
  • Performance evaluation

    • f_noise of green beam / PDH performance
    • Relative f_noise between the PSL green and the Arm transmitted green
    • ALS performance
  • Sophistication of the scheme

    • Automatic handing off scripts
    • Ready-to-go panels for AdvLIGO
    • Automatic alignment of the green beam
    • ---
    • Green Michelson for precise ETM calibration
    • Absolute length / mode spacing measurement by green

Detailed design

Control information

Noise Requirements

Advanced_Techniques/Green_Locking (last edited 2015-06-23 03:44:00 by EricquinteroATligoDOTorg)