Differences between revisions 64 and 83 (spanning 19 versions)
Revision 64 as of 2010-04-27 22:36:03
Size: 3689
Editor: KiwamuIzumi
Comment:
Revision 83 as of 2010-07-13 03:10:09
Size: 3410
Editor: KiwamuIzumi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= Arm Length Stabilization by injecting green laser beams from the arm ends = = Arm Length Stabilization using green laser beams =
[[BR]]

  . attachment:green_man.jpg
[[BR]]

   . We are developing a technique of Arm Length Stabilization (ALS) for advanced LIGO. The technique employs two auxiliary green lasers at each end of the arm. Basically these lasers are able to sense the displacement of the each arm independently on the main laser, eventually make full lock acquisition of advanced interferometer more robust and reliable.

[[BR]]
[[BR]]
Line 4: Line 14:
[[BR]]
Line 5: Line 16:
{i} aLIGO ALS wiki http://ilog.ligo-wa.caltech.edu:7285/advligo/Arm_Length_Stabilisation
Line 8: Line 18:
-------
Line 10: Line 19:
== Plan == == Designs and Plans ==
Line 12: Line 21:
 * [[Upgrade 09/GreenLock/timeline|time line]] describes where we are now and where we go.  * The time line describes where we are now and where we go. B) [[Upgrade 09/GreenLock/timeline|time line]]
Line 19: Line 28:
== Detailed design ==
==== Green Preliminary Design ====
   . <<ImageLink(green_vertex_preliminary_design.png,Upgrade 09/GreenLock/Preliminary design for the vertex,height=200)>>
   <<ImageLink(green_ETM_preliminary_design.png,Upgrade 09/GreenLock/Preliminary design for the end,height=200)>>



[[BR]]

-------
== Installation status ==
Line 42: Line 62:
  * B) [[Upgrade 09/GreenLock/Electronics|Electronics]]
 
Line 45: Line 67:
==== Green Preliminary Design ====
   . <<ImageLink(green_vertex_preliminary_design.png,Upgrade 09/GreenLock/Preliminary design for the vertex,height=200)>>
   <<ImageLink(green_ETM_preliminary_design.png,Upgrade 09/GreenLock/Preliminary design for the end,height=200)>>

 . B) [[Upgrade 09/GreenLock/Control Information|jump to Control Information]]
Line 50: Line 71:
=== Development roadmap ===
 * '''End table arrangement'''
  * NPRO placement / optical assembly at the end
== Links ==
 . B) [[Upgrade 09/GreenLock/Noise Requirement|jump to Noise Requirement]]
Line 54: Line 74:
  * SHG at the end table
  * Control system placement
  * Coarse alignment to the cavity
  * Fine alignment
  * Lock of the green beam to the cavity
 * '''At the PSL table'''
  * SHG at the PSL table
 * '''Digital control'''
  * Virtual Green lock by RCG
  * GPIB interfaces
 * '''Vertex tank optical arrangement'''
  * In-vac steering (PO transmission / Periscope / Mirrors)
  * Vertex phase noise measurement
   * Electronics placement
   * Control system implementation
 * '''Performance evaluation'''
  * f_noise of green beam / PDH performance

  * Relative f_noise between the PSL green and the Arm transmitted green
  * ALS performance
 * '''Sophistication of the scheme'''
  * Automatic handing off scripts

  * Ready-to-go panels for AdvLIGO
  * Automatic alignment of the green beam
  * ---
  * Green Michelson for precise ETM calibration

  * Absolute length / mode spacing measurement by green''' '''

----

== Control information ==
[[Upgrade 09/GreenLock/Control Information|jump to Control Information]]


== Noise Requirements ==
[[Upgrade 09/GreenLock/Noise Requirement|jump to Noise Requirement]]
 . {i} aLIGO ALS wiki http://ilog.ligo-wa.caltech.edu:7285/advligo/Arm_Length_Stabilisation
 . Description of the optical / servo configuration [https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=6888 LIGO DCC]
 . Servo modeling (!SimLink) [https://nodus.ligo.caltech.edu:30889/svn/trunk/docs/upgrade08/Green_Locking/Servo_modeling/ 40mSVN]

Arm Length Stabilization using green laser beams

BR

  • attachment:green_man.jpg

BR

  • We are developing a technique of Arm Length Stabilization (ALS) for advanced LIGO. The technique employs two auxiliary green lasers at each end of the arm. Basically these lasers are able to sense the displacement of the each arm independently on the main laser, eventually make full lock acquisition of advanced interferometer more robust and reliable.

BR BR

<<TableOfContents: execution failed [Argument "maxdepth" must be an integer value, not "[2]"] (see also the log)>>

BR


Designs and Plans

time line

  • The time line describes where we are now and where we go. B) time line

Conceptual design

Green Preliminary Design

  • green_vertex_preliminary_design.png green_ETM_preliminary_design.png

BR


Installation status

Advanced_Techniques/Green_Locking (last edited 2015-06-23 03:44:00 by EricquinteroATligoDOTorg)