== Detailed design ==
 * '''Design and Purchasing Lists'''
  * Optical design / [[Upgrade 09/Purchase List/Green Locking|item list]]
  * Electronics / control design / [[Upgrade 09/Purchase List/Green Locking|item list]]
  * [[Upgrade 09/Purchase List/Green Locking|Purchase list]]
 * '''Detailed considerations'''
  * Optical Layout ([attachment:green_optics.png Table]/ In-vac)
   * [[Upgrade 09/GreenLock/end table|ETM / end table]] <<ImageLink(endtable.jpg,Upgrade 09/GreenLock/end_table)>>
   * [[Upgrade 09/Optical Layout#wedge|ITM wedge effect]]
   * [[Upgrade 09/Optical Layout|Periscopes for beam steering from PR3/SR3 transmissions to the PSL viewport]]
   * PSL viewport modification (viewport cover / tube / PSL box / periscope on the PSL table)
   * PSL table
   * Laser & SHG specs --- power, polarization, Xtals
    . '' - references''
    . [1] G.D.Boyd and D.A. Kleinman, [http://jap.aip.org/japiau/v39/i8/p3597_s1 "Parametric interaction of Focused Gaussian Light Beams", J.A. Phys. 39, 3597 (1968)]

    . [2] C. Zhang, Y.Qin and Y.Zhu, [http://www.opticsinfobase.org/ol/abstract.cfm?uri=ol-33-7-720 "Perfect quasi-phase matching for the third-harmonic generation using focused Gaussian beams",Opt. Lett. 33, 720 (2008)]

  * Main optics specs (review)
  * Mode matching ([attachment:modematch_END.png mode matching at end table])
  * Green generation
   . [attachment:manual_oven.pdf manual for the covesion oven]
  * Expected performance / noise / control system range
  * Digital servo / operation
  * Alignment (initial / fine / automatic)
Line 48: Line 23:

Line 84: Line 61:


== Detailed design ==
 * '''Design and Purchasing Lists'''
  * Optical design / [[Upgrade 09/Purchase List/Green Locking|item list]]
  * Electronics / control design / [[Upgrade 09/Purchase List/Green Locking|item list]]
  * [[Upgrade 09/Purchase List/Green Locking|Purchase list]]
 * '''Detailed considerations'''
  * Optical Layout ([attachment:green_optics.png Table]/ In-vac)
   * [[Upgrade 09/GreenLock/end table|ETM / end table]] <<ImageLink(endtable.jpg,Upgrade 09/GreenLock/end_table)>>
   * [[Upgrade 09/Optical Layout#wedge|ITM wedge effect]]
   * [[Upgrade 09/Optical Layout|Periscopes for beam steering from PR3/SR3 transmissions to the PSL viewport]]
   * PSL viewport modification (viewport cover / tube / PSL box / periscope on the PSL table)
   * PSL table
   * Laser & SHG specs --- power, polarization, Xtals
    . '' - references''
    . [1] G.D.Boyd and D.A. Kleinman, [http://jap.aip.org/japiau/v39/i8/p3597_s1 "Parametric interaction of Focused Gaussian Light Beams", J.A. Phys. 39, 3597 (1968)]

    . [2] C. Zhang, Y.Qin and Y.Zhu, [http://www.opticsinfobase.org/ol/abstract.cfm?uri=ol-33-7-720 "Perfect quasi-phase matching for the third-harmonic generation using focused Gaussian beams",Opt. Lett. 33, 720 (2008)]

  * Main optics specs (review)
  * Mode matching ([attachment:modematch_END.png mode matching at end table])
  * Green generation
   . [attachment:manual_oven.pdf manual for the covesion oven]
  * Expected performance / noise / control system range
  * Digital servo / operation
  * Alignment (initial / fine / automatic)

Arm Length Stabilization by injecting green laser beams from the arm ends

<<TableOfContents: execution failed [Argument "maxdepth" must be an integer value, not "[2]"] (see also the log)>>

{i} aLIGO ALS wiki http://ilog.ligo-wa.caltech.edu:7285/advligo/Arm_Length_Stabilisation



Plan

time line

  • time line describes where we are now and where we go.

Conceptual design

Green Preliminary Design

  • green_vertex_preliminary_design.png green_ETM_preliminary_design.png

Development roadmap

  • End table arrangement

    • NPRO placement / optical assembly at the end
    • SHG at the end table
    • Control system placement
    • Coarse alignment to the cavity
    • Fine alignment
    • Lock of the green beam to the cavity
  • At the PSL table

    • SHG at the PSL table
  • Digital control

    • Virtual Green lock by RCG
    • GPIB interfaces
  • Vertex tank optical arrangement

    • In-vac steering (PO transmission / Periscope / Mirrors)
    • Vertex phase noise measurement
      • Electronics placement
      • Control system implementation
  • Performance evaluation

    • f_noise of green beam / PDH performance
    • Relative f_noise between the PSL green and the Arm transmitted green
    • ALS performance
  • Sophistication of the scheme

    • Automatic handing off scripts
    • Ready-to-go panels for AdvLIGO
    • Automatic alignment of the green beam
    • ---
    • Green Michelson for precise ETM calibration
    • Absolute length / mode spacing measurement by green

Detailed design


Control information

jump to Control Information

Noise Requirements

jump to Noise Requirement

Advanced_Techniques/Green_Locking (last edited 2015-06-23 03:44:00 by EricquinteroATligoDOTorg)