Differences between revisions 60 and 63 (spanning 3 versions)
Revision 60 as of 2010-04-27 22:19:29
Size: 4157
Editor: KiwamuIzumi
Comment:
Revision 63 as of 2010-04-27 22:26:31
Size: 3691
Editor: KiwamuIzumi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
<<TableOfContents([2])>>aLIGO ALS wiki <<TableOfContents([2])>>
Line 4: Line 4:
http://ilog.ligo-wa.caltech.edu:7285/advligo/Arm_Length_Stabilisation
{i} aLIGO ALS wiki
http://ilog.ligo-wa.caltech.edu:7285/advligo/Arm_Length_Stabilisation
Line 84: Line 85:
Line 85: Line 87:
=== Laser Frequency vs Crystal Temperature ===
Plots of the laser frequency vs temperature (measured by beating against a second laser) are shown below. [http://nodus.ligo.caltech.edu:8080/40m/2794 Also, see the elog here].

|| '''Laser''' || '''df/dT''' || '''df/dV - within a mode''' || '''df/dV - average''' ||
|| Lightwave || 2.8MHz/mK || 5GHz/V || 1.6GHz/V ||
|| Innolight || 3.3MHz/mK || || ||
[[Upgrade 09/GreenLock/Control Information|jump to Control Information]]
Line 93: Line 90:
==== Lightwave laser ====
attachment:lightwave_temperature_sweep.png

==== Innolight laser ====
attachment:innolight_temperature_sweep.png

= Noise Requirements =
== Noise Requirements ==

Arm Length Stabilization by injecting green laser beams from the arm ends

<<TableOfContents: execution failed [Argument "maxdepth" must be an integer value, not "[2]"] (see also the log)>>

{i} aLIGO ALS wiki http://ilog.ligo-wa.caltech.edu:7285/advligo/Arm_Length_Stabilisation



Plan

time line

  • time line describes where we are now and where we go.

Conceptual design

Detailed design

Green Preliminary Design

  • green_vertex_preliminary_design.png green_ETM_preliminary_design.png

Development roadmap

  • End table arrangement

    • NPRO placement / optical assembly at the end
    • SHG at the end table
    • Control system placement
    • Coarse alignment to the cavity
    • Fine alignment
    • Lock of the green beam to the cavity
  • At the PSL table

    • SHG at the PSL table
  • Digital control

    • Virtual Green lock by RCG
    • GPIB interfaces
  • Vertex tank optical arrangement

    • In-vac steering (PO transmission / Periscope / Mirrors)
    • Vertex phase noise measurement
      • Electronics placement
      • Control system implementation
  • Performance evaluation

    • f_noise of green beam / PDH performance
    • Relative f_noise between the PSL green and the Arm transmitted green
    • ALS performance
  • Sophistication of the scheme

    • Automatic handing off scripts
    • Ready-to-go panels for AdvLIGO
    • Automatic alignment of the green beam
    • ---
    • Green Michelson for precise ETM calibration
    • Absolute length / mode spacing measurement by green


Control information

jump to Control Information

Noise Requirements

jump to Noise Requirement

Advanced_Techniques/Green_Locking (last edited 2015-06-23 03:44:00 by EricquinteroATligoDOTorg)