Differences between revisions 6 and 93 (spanning 87 versions)
Revision 6 as of 2009-08-25 09:31:57
Size: 1763
Editor: YoichiAso
Comment:
Revision 93 as of 2010-10-05 20:02:23
Size: 1528
Editor: KiwamuIzumi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= Green Laser Injection for Arm Pre-Lock = <<Anchor(TOP)>>
= Arm Length Stabilization using green laser beams =
Line 3: Line 4:
We plan to install green lasers, which are phase locked to the PSL laser, at each end station to pre-lock the arm cavities before the lock acquisition.    . attachment:god_of_green.png
Line 5: Line 7:
== Basic Concept ==
Line 7: Line 8:
== Noise Requirement ==
I'd say the arm cavity length should not change more than 1/100 of the resonance width in the time scale of 10sec.[[BR]]
For this to be fulfilled, the RMS fluctuation of the cavity length must be suppressed below 1e-11m level.[[BR]]
Does this make sense ?
Line 12: Line 9:
=== Noise Sources ===
==== PLL phase noise ====
==== Phase noise from the cavity common mode motion ====
When the cavity is locked to the green laser, the differential motion of the two mirrors will be suppressed by the servo.[[BR]]
However, the common motion of the cavity mirrors will not be suppressed. This common motion will show up as phase noises [[BR]]
of the lasers. The time derivative of phase noise is equivalent to frequency noise. The equivalent displacement noise seen [[BR]]
by the cavity is dL=(w*x*L)/c, where w is the angular frequency, x is the displacement noise spectrum of the common motion, [[BR]]
L is the length of the cavity and c is the speed of light (see [attachment:PhaseNoise.pdf] for derivation).
Line 21: Line 10:
The two lasers (PSL and green) see the same motion of the cavity but from the opposite sides. Hence, the effect of this phase [[BR]]
noise to the two error signals of the green and the PSL lasers will be 180 deg. out of phase. The feedback from the green laser to [[BR]]
the cavity length will, therefore, create a noise for the PSL laser.
= Conceptual Design =
Line 25: Line 12:
In order to estimate the contribution of this noise to the green lock, I plotted the estimated phase noise in the following figure.[[BR]]
attachment:PhaseNoise.png
   <<ImageLink(green_vertex_preliminary_design.png,Upgrade 09/GreenLock/Preliminary design for the vertex,height=200)>>
   <<ImageLink(green_ETM_preliminary_design.png,Upgrade 09/GreenLock/Preliminary design for the end,height=200)>>




  Optical Layout ([attachment:green_optics.png Table]/ In-vac)
  [[Upgrade 09/GreenLock/end table|ETM / end table]] <<ImageLink(endtable.jpg,Upgrade 09/GreenLock/end_table)>>
  [[Upgrade 09/Optical Layout#wedge|ITM wedge effect]]
   [[Upgrade 09/Optical Layout|Periscopes for beam steering from PR3/SR3 transmissions to the PSL viewport]]

  Mode matching ([attachment:modematch_END.png mode matching at end table])
  Green generation
  [attachment:manual_oven.pdf manual for the covesion oven]
  [[Upgrade 09/GreenLock/Electronics|Electronics]]
 
 
  [[Upgrade 09/Purchase List/Green Locking|Purchase list]]
  [[Upgrade 09/GreenLock/Control Information|jump to Control Information]]
  [[Upgrade 09/GreenLock/Noise Requirement|jump to Noise Requirement]]


= links =
|| ''' aLIGO ALS wiki ''' || http://ilog.ligo-wa.caltech.edu:7285/advligo/Arm_Length_Stabilisation ||
|| ''' Description of the optical / servo configuration ''' || [https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=6888 LIGO DCC] ||
|| ''' Servo modeling (!SimLink) ''' || [https://nodus.ligo.caltech.edu:30889/svn/trunk/docs/upgrade08/Green_Locking/Servo_modeling/ 40mSVN] ||

 

Arm Length Stabilization using green laser beams

  • attachment:god_of_green.png

Conceptual Design

  • green_vertex_preliminary_design.png green_ETM_preliminary_design.png

links

aLIGO ALS wiki

http://ilog.ligo-wa.caltech.edu:7285/advligo/Arm_Length_Stabilisation

Description of the optical / servo configuration

[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=6888 LIGO DCC]

Servo modeling (SimLink)

[https://nodus.ligo.caltech.edu:30889/svn/trunk/docs/upgrade08/Green_Locking/Servo_modeling/ 40mSVN]

Advanced_Techniques/Green_Locking (last edited 2015-06-23 03:44:00 by EricquinteroATligoDOTorg)