Differences between revisions 56 and 57
Revision 56 as of 2010-04-27 22:05:39
Size: 4105
Editor: KiwamuIzumi
Comment:
Revision 57 as of 2010-04-27 22:09:42
Size: 4105
Editor: KiwamuIzumi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 45: Line 45:
<<ImageLink(green_vertex_preliminary_design.png,Preliminary design for the end,height=200)>>
<<ImageLink(green_ETM_preliminary_design.png,Preliminary design for the vertex,height=200)>>
<<ImageLink(green_vertex_preliminary_design.png,Preliminary design for the vertex,height=200)>>
<<ImageLink(green_ETM_preliminary_design.png,Preliminary design for the end,height=200)>>

Arm Length Stabilization by injecting green laser beams from the arm ends

<<TableOfContents: execution failed [Argument "maxdepth" must be an integer value, not "[2]"] (see also the log)>>aLIGO ALS wiki

http://ilog.ligo-wa.caltech.edu:7285/advligo/Arm_Length_Stabilisation



Plan

time line

  • time line describes where we are now and where we go.

Conceptual design

Detailed design

Green Preliminary Design

green_vertex_preliminary_design.png green_ETM_preliminary_design.png

Development roadmap

  • End table arrangement

    • NPRO placement / optical assembly at the end
    • SHG at the end table
    • Control system placement
    • Coarse alignment to the cavity
    • Fine alignment
    • Lock of the green beam to the cavity
  • At the PSL table

    • SHG at the PSL table
  • Digital control

    • Virtual Green lock by RCG
    • GPIB interfaces
  • Vertex tank optical arrangement

    • In-vac steering (PO transmission / Periscope / Mirrors)
    • Vertex phase noise measurement
      • Electronics placement
      • Control system implementation
  • Performance evaluation

    • f_noise of green beam / PDH performance
    • Relative f_noise between the PSL green and the Arm transmitted green
    • ALS performance
  • Sophistication of the scheme

    • Automatic handing off scripts
    • Ready-to-go panels for AdvLIGO
    • Automatic alignment of the green beam
    • ---
    • Green Michelson for precise ETM calibration
    • Absolute length / mode spacing measurement by green


Control information

Laser Frequency vs Crystal Temperature

Plots of the laser frequency vs temperature (measured by beating against a second laser) are shown below. [http://nodus.ligo.caltech.edu:8080/40m/2794 Also, see the elog here].

Laser

df/dT

df/dV - within a mode

df/dV - average

Lightwave

2.8MHz/mK

5GHz/V

1.6GHz/V

Innolight

3.3MHz/mK

Lightwave laser

attachment:lightwave_temperature_sweep.png

Innolight laser

attachment:innolight_temperature_sweep.png

Noise Requirements

jump to Noise Requirement

Advanced_Techniques/Green_Locking (last edited 2015-06-23 03:44:00 by EricquinteroATligoDOTorg)