Differences between revisions 2 and 110 (spanning 108 versions)
Revision 2 as of 2009-08-25 00:22:45
Size: 490
Editor: YoichiAso
Comment:
Revision 110 as of 2011-03-24 22:52:01
Size: 2447
Editor: KiwamuIzumi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= Green Laser Injection for Arm Pre-Lock = ## page was renamed from Upgrade 09/GreenLock
<<Anchor(TOP)>>
Line 3: Line 4:
We plan to install green lasers, which are phase locked to the PSL laser, at each end station to pre-lock the arm cavities before the lock acquisition.    . attachment:god_of_green.png
Line 5: Line 7:
== Basic Concept ==
== Noise Requirements ==
I'd say the arm cavity length should not change more than 1/100 of the resonance width in the time scale of 10sec.
For this to be fulfilled, the RMS change of the cavity length must be suppressed below 1e-11m level.
Does this make sense ?



= Overview =

 The diagrams below show a conceptual design of the green locking technique

   <<ImageLink(green_vertex_preliminary_design.png,Upgrade 09/GreenLock/Preliminary design for the vertex,height=200)>>
   <<ImageLink(green_ETM_preliminary_design.png,Upgrade 09/GreenLock/Preliminary design for the end,height=200)>>

= Plans =

||<|3> ''' long term plans ''' || ''' action item list ''' || [:Upgrade 09/GreenLock/action_item_list] ||
||- - - - || - - - - ||
||- - - - || - - - - ||
||<|3> ''' near term plans ''' ||'''January 2011''' || [:Upgrade 09/GreenLock/January_2011] ||
||- - - - || - - - - ||
||- - - - || - - - - ||
||<|3> ''' past plans ''' ||''' October 2010''' || [:Upgrade 09/GreenLock/October_2010] ||
|| ''' November 2010 '''||[:Upgrade 09/GreenLock/October_2010] ||
|| - - - - || - - - - ||
[[BR]]

= Developer's page =

||''' Optical Layout '''|| ([attachment:green_optics.png Table]/ In-vac) ||
|| ''' end table ''' || [[Upgrade 09/GreenLock/end table|ETM / end table]] ||
|| ''' end table ''' || <<ImageLink(endtable.jpg,Upgrade 09/GreenLock/end_table)>> ||
|| ''' Lasers ''' || [[Advanced_Techniques/Green_Locking|Lasers]] ||
|| ''' wedge effect ''' || [[Upgrade 09/Optical Layout#wedge|ITM wedge effect]] ||
|| ''' in-vac ''' || [[Upgrade 09/Optical Layout|Periscopes for beam steering from PR3/SR3 transmissions to the PSL viewport]] ||
|| ''' Mode matching ''' || ([attachment:modematch_END.png mode matching at end table]) ||
|| ''' Electronics ''' || [:Upgrade 09/GreenLock/Electronics] ||
|| ''' sensing and control ''' || [:Upgrade 09/GreenLock/Control Information] ||
|| ''' about the doubling oven ''' || [attachment:PV40.pdf drawing of PV40 oven], [attachment:PVP2.pdf drawing of the base plate PVP2], [attachment:manual_oven.pdf manual for the covesion oven] ||
|| ''' noise requirements ''' ||[:Upgrade 09/GreenLock/Noise Requirement] ||
|| ''' purchase list ''' || [:Upgrade 09/Purchase List/Green Locking] ||
  


= Links =
|| ''' aLIGO ALS wiki ''' || http://ilog.ligo-wa.caltech.edu:7285/advligo/Arm_Length_Stabilisation ||
|| ''' Description of the optical / servo configuration ''' || https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=6888 ||
|| ''' Servo modeling (!SimLink) ''' || https://nodus.ligo.caltech.edu:30889/svn/trunk/docs/upgrade08/Green_Locking/Servo_modeling/ ||

  • attachment:god_of_green.png

Overview

  • The diagrams below show a conceptual design of the green locking technique
    • green_vertex_preliminary_design.png green_ETM_preliminary_design.png

Plans

long term plans

action item list

[:Upgrade 09/GreenLock/action_item_list]

- - - -

- - - -

- - - -

- - - -

near term plans

January 2011

[:Upgrade 09/GreenLock/January_2011]

- - - -

- - - -

- - - -

- - - -

past plans

October 2010

[:Upgrade 09/GreenLock/October_2010]

November 2010

[:Upgrade 09/GreenLock/October_2010]

- - - -

- - - -

BR

Developer's page

Optical Layout

([attachment:green_optics.png Table]/ In-vac)

end table

ETM / end table

end table

endtable.jpg

Lasers

Lasers

wedge effect

ITM wedge effect

in-vac

Periscopes for beam steering from PR3/SR3 transmissions to the PSL viewport

Mode matching

([attachment:modematch_END.png mode matching at end table])

Electronics

[:Upgrade 09/GreenLock/Electronics]

sensing and control

[:Upgrade 09/GreenLock/Control Information]

about the doubling oven

[attachment:PV40.pdf drawing of PV40 oven], [attachment:PVP2.pdf drawing of the base plate PVP2], [attachment:manual_oven.pdf manual for the covesion oven]

noise requirements

[:Upgrade 09/GreenLock/Noise Requirement]

purchase list

[:Upgrade 09/Purchase List/Green Locking]

Links

aLIGO ALS wiki

http://ilog.ligo-wa.caltech.edu:7285/advligo/Arm_Length_Stabilisation

Description of the optical / servo configuration

https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=6888

Servo modeling (SimLink)

https://nodus.ligo.caltech.edu:30889/svn/trunk/docs/upgrade08/Green_Locking/Servo_modeling/

Advanced_Techniques/Green_Locking (last edited 2015-06-23 03:44:00 by EricquinteroATligoDOTorg)