| <<TableOfContents([2])>> = Arm length stabilization injecting green laser from the end of the arm = == Plan == === Conceptual design === * Description of the optical / servo configuration [https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=6888 LIGO DCC] * Servo modeling ("SimLink") [https://nodus.ligo.caltech.edu:30889/svn/trunk/docs/upgrade08/Green_Locking/Servo_modeling/ 40mSVN] |
<<Anchor(TOP)>> = Arm Length Stabilization using green laser beams = |
| Line 8: | Line 4: |
| === Detailed design === * Optical design / item list |
. attachment:god_of_green.png |
| Line 11: | Line 7: |
| * Electronics / control design / item list | |
| Line 13: | Line 8: |
| === Detailed considerations === * Optical Layout (Table / In-vac) * Mode matching * Main optics specs * Green generation * Expected performance / noise / control system range |
|
| Line 20: | Line 9: |
| * Digital servo / operation | |
| Line 22: | Line 10: |
| * Alignment (initial / fine / automatic) | = Overview and Conceptual design = |
| Line 24: | Line 12: |
| === Development roadmap === * '''End table arrangement''' * NPRO placement / optical assembly at the end |
<<ImageLink(green_vertex_preliminary_design.png,Upgrade 09/GreenLock/Preliminary design for the vertex,height=200)>> <<ImageLink(green_ETM_preliminary_design.png,Upgrade 09/GreenLock/Preliminary design for the end,height=200)>> |
| Line 28: | Line 15: |
| * SHG at the end table * Control system placement * Coarse alignment to the cavity * Fine alignment * Lock of the green beam to the cavity * '''At the PSL table''' * SHG at the PSL table * '''Digital control''' * Virtual Green lock by RCG * GPIB interfaces * '''Vertex tank optical arrangement''' * In-vac steering (PO transmission / Periscope / Mirrors) * Vertex phase noise measurement * Electronics placement * Control system implementation * '''Performance evaluation''' * f_noise of green beam / PDH performance |
|
| Line 46: | Line 16: |
| * Relative f_noise between the PSL green and the Arm transmitted green * ALS (Arm Length Stabilization) performance * '''Sophistication of the scheme''' * Automatic handing off scripts |
|
| Line 51: | Line 17: |
| * Ready-to-go panels for AdvLIGO * Automatic alignment of the green beam * . * Green Michelson for precise ETM calibration |
|
| Line 56: | Line 18: |
| * Absolute length / mode spacing measurement by green''' ''' | Optical Layout ([attachment:green_optics.png Table]/ In-vac) [[Upgrade 09/GreenLock/end table|ETM / end table]] <<ImageLink(endtable.jpg,Upgrade 09/GreenLock/end_table)>> [[Upgrade 09/Optical Layout#wedge|ITM wedge effect]] [[Upgrade 09/Optical Layout|Periscopes for beam steering from PR3/SR3 transmissions to the PSL viewport]] |
| Line 58: | Line 23: |
| ---- == Noise Requirement == I'd say the arm cavity length should not change more than 1/100 of the resonance width in the time scale of 10sec.[[BR]] For this to be fulfilled, the RMS fluctuation of the cavity length must be suppressed below 1e-11m level.[[BR]] Does this make sense ? |
Mode matching ([attachment:modematch_END.png mode matching at end table]) |
| Line 62: | Line 26: |
| === Noise Sources === ==== PLL phase noise ==== ==== Phase noise from the cavity common mode motion ==== When the cavity is locked to the green laser, the differential motion of the two mirrors will be suppressed by the servo.[[BR]] However, the common motion of the cavity mirrors will not be suppressed. This common motion will show up as phase noises [[BR]] of the lasers. The time derivative of phase noise is equivalent to frequency noise. The equivalent displacement noise seen [[BR]] by the cavity is dL=(w*x*L)/c, where w is the angular frequency, x is the displacement noise spectrum of the common motion, [[BR]] L is the length of the cavity and c is the speed of light (see [attachment:PhaseNoise.pdf attachment:PhaseNoise.pdf] for derivation). |
[[Upgrade 09/GreenLock/Electronics|Electronics]] [[Upgrade 09/GreenLock/Control Information|jump to Control Information]] |
| Line 67: | Line 33: |
| attachment:Cavity-Common-Diff.png | |
| Line 69: | Line 34: |
| The two lasers (PSL and green) see the same motion of the cavity but from the opposite sides. Hence, the effect of this phase [[BR]] noise to the two error signals of the green and the PSL lasers will be 180 deg. out of phase. The feedback from the green laser to [[BR]] the cavity length will, therefore, create a noise for the PSL laser. In order to estimate the contribution of this noise to the green lock, I plotted the estimated phase noise in the following figure.[[BR]] attachment:PhaseNoise.png I first took a spectrum of ETMX OSEM pos signal to see the motion of the mirror with damping.[[BR]] The blue curve in the figure shows the calibrated OSEM spectrum using the well known 2V/mm OSEM [[BR]] calibration and the whitening filter shape (3Hz zero, 30Hz and 100Hz pole).[[BR]] However, OSEM signal is not a good measure of the seismic noise below the pendulum resonant frequency[[BR]] because the suspension cage and the mirror move together at low frequencies.[[BR]] As a tentative solution, I put a filter to make the spectrum look like 1/f^2 below 0.8Hz.[[BR]] This is diffinitely a hacky solution, and should be replaced with a correctly measured [[BR]] seismic spectrum. The estimated seismic motion was converted to the phase noise using the above formula.[[BR]] The RMS displacement noise above 0.1Hz is about 3e-12 m, which satisfies the requirement for [[BR]] the green lock stability (1e-11m). |
= links = || ''' aLIGO ALS wiki ''' || http://ilog.ligo-wa.caltech.edu:7285/advligo/Arm_Length_Stabilisation || || ''' Description of the optical / servo configuration ''' || [https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=6888 LIGO DCC] || || ''' Servo modeling (!SimLink) ''' || [https://nodus.ligo.caltech.edu:30889/svn/trunk/docs/upgrade08/Green_Locking/Servo_modeling/ 40mSVN] || || ''' manual for the doubling oven ''' || [attachment:manual_oven.pdf manual for the covesion oven] || || ''' noise requirements ''' ||[:Upgrade 09/GreenLock/Noise Requirement] || || ''' purchase list ''' || [[Upgrade 09/Purchase List/Green Locking|Purchase list]] || |
Arm Length Stabilization using green laser beams
- attachment:god_of_green.png
Overview and Conceptual design
- Optical Layout ([attachment:green_optics.png Table]/ In-vac) Mode matching ([attachment:modematch_END.png mode matching at end table])
links
aLIGO ALS wiki |
http://ilog.ligo-wa.caltech.edu:7285/advligo/Arm_Length_Stabilisation |
Description of the optical / servo configuration |
[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=6888 LIGO DCC] |
Servo modeling (SimLink) |
[https://nodus.ligo.caltech.edu:30889/svn/trunk/docs/upgrade08/Green_Locking/Servo_modeling/ 40mSVN] |
manual for the doubling oven |
[attachment:manual_oven.pdf manual for the covesion oven] |
noise requirements |
[:Upgrade 09/GreenLock/Noise Requirement] |
purchase list |