| . attachment:orange.png final alignment including 1064 optics | . attachment:green.png final alignment including 1064 optics |
| Line 30: | Line 31: |
| . attachment:orange.png characterization of the RFPD | . attachment:green.png characterization of the RFPD |
| Line 36: | Line 37: |
| . attachment:orange.png prepare the front end machine {{{ c1iscex }}} | . attachment:green.png prepare the front end machine {{{ c1iscex }}} |
| Line 38: | Line 39: |
| . attachment:orange.png run the realtime code on a Gentoo | . attachment:green.png run the realtime code on a Gentoo |
| Line 49: | Line 50: |
| . attachment:red.png renew some old diagrams | . attachment:orange.png renew some old diagrams |
goals in this month
- get a green beam coming from the chamber to the PSL table
- do a science at the PSL table
- develop a simlink model for simulated plant
to do list
attachment:green.png complete |
attachment:orange.png intermediate state |
attachment:red.png nothing happened |
attachment:black.png gave up |
in-vac work
- attachment:green.png align the beam axis at the end station
- attachment:green.png open the heavy doors
- attachment:green.png take the access connector out
- attachment:green.png install the last periscope and steering mirrors
- attachment:green.png final alignment including 1064 optics
work at the PSL table
- attachment:green.png put a 90/10 beam splitter after the PMC
- attachment:green.png rearrange the doubling crystal
attachment:green.png mode match to the doubling crystal --> it has s-polarization
- attachment:green.png check the polarization of the crystal
- attachment:green.png make the hole wider on the wall of the PSL booth
- attachment:green.png place Hartmut's RFPD
- attachment:green.png characterization of the RFPD
- attachment:green.png find beat note by sweeping the end laser's temperature
digital system
attachment:green.png prepare the front end machine c1iscex
- attachment:green.png make a simulated plant
- attachment:green.png run the realtime code on a Gentoo
- attachment:green.png RFM
- attachment:green.png recheck the ADCs
- attachment:green.png digitally slow feedback to the laser temperature
misc.
- attachment:green.png re-check the items
- attachment:orange.png re-check the mode matching of the beam going to the cavity
- attachment:green.png have a prediction what we will see at the vertex
- attachment:orange.png make the wiki page better and more user friendly
- attachment:orange.png renew some old diagrams
- attachment:green.png buy DC blocks from mini circuit
considerations
what is the polarization of the doubling crystal
The one sitting on the PSL table has S-polarization apparently. Since the beam coming from PMC is P-polarizing we had to put a lamda/2 wave plate.