= goal in this month =

 . get a green beam coming from the chamber to the PSL table

 . do a science at the PSL table

 . develop a simulink model
Line 6: Line 14:
 . ''' in-vac work '''
   . attachment:green.png align the beam axis at the end station
   . attachment:green.png open the heavy doors
   . attachment:green.png take the access connector out
   . attachment:orange.png install the last periscope and steering mirrors



[[BR]]
 . ''' work at the PSL table '''
   . attachment:red.png rearrange the doubling crystal
   . attachment:red.png mode match to the doubling crystal
   . attachment:red.png
   . attachment:red.png make the hole wider on the wall of the PSL booth

[[BR]]
 . ''' digital system'''
   . attachment:green.png make a simulated plant
   . attachment:red.png run the realtime code on a Gentoo
   . attachment:orange.png RFM
   . attachment:orange.png

 . ''' misc. '''
    . attachment:red.png re-check the items
    . attachment:red.png re-check the mode matching of the beam going to the cavity
    . attachment:red.png have a prediction what we will see at the vertex


[[BR]]

goal in this month

  • get a green beam coming from the chamber to the PSL table
  • do a science at the PSL table
  • develop a simulink model

to do list

attachment:green.png complete

attachment:orange.png intermediate state

attachment:red.png nothing happened

attachment:black.png gave up

BR

  • in-vac work

    • attachment:green.png align the beam axis at the end station
    • attachment:green.png open the heavy doors
    • attachment:green.png take the access connector out
    • attachment:orange.png install the last periscope and steering mirrors

BR

  • work at the PSL table

    • attachment:red.png rearrange the doubling crystal
    • attachment:red.png mode match to the doubling crystal
    • attachment:red.png
    • attachment:red.png make the hole wider on the wall of the PSL booth

BR

  • digital system

    • attachment:green.png make a simulated plant
    • attachment:red.png run the realtime code on a Gentoo
    • attachment:orange.png RFM
    • attachment:orange.png
  • misc.

    • attachment:red.png re-check the items
    • attachment:red.png re-check the mode matching of the beam going to the cavity