40m Lab Organization Plan
Overwall
- What's the point?
- Modernization of the lab: Aim the use for another twenty years
- Key categories
- Quieter Lab
- Organized Storage
Entrance Area
- Booties not well organized
- Wire shelf not well organized
- Remove the old furniture?
- Needs a plan
Drill Press Room
- Remove metal garbage
- Missing vacuum cleaner
- Not well organized
- Always dirty due to metal debris
- DeWalt/Makita charging situation
- Drill Bits / Screwdriver Bits
- Remove all the dirty stuff
- Turn this room to
- Server room
- DC Power supply room
- What's the AC situation?
Office Area / Work Bench
Control Room
Vertex hall
- Move the orphan rack doors to somewhere.
PSL Enclosure
- Remove OLD PSL - more space
South End
South Arm
East End
East Arm
Bake Lab
- Salvage 40m stuff
- Organize the cabinet stuff
- Combine the bake lab remnant and the 40m cabinet remnant
South Outdoor Storage
Exterier and Interier
- Door Sign
- Poster