Differences between revisions 5 and 12 (spanning 7 versions)
Revision 5 as of 2023-12-21 01:05:17
Size: 971
Comment:
Revision 12 as of 2024-05-25 02:29:05
Size: 2418
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
== Overwall == == Overall ==
Line 7: Line 7:
     * Convenience for the research progress
Line 10: Line 11:
  * Rack photographs
Line 12: Line 15:
 * Booties not well organized
 * Wire shelf not well organized
 * Booties/safety glasses to be better organized
 * Wire shelf to be better organized
Line 18: Line 21:

 * Replace N2 bottles with a compressor (to be placed somewhere else like mezzanine)
Line 27: Line 32:
Line 29: Line 35:
   * DC Power supply room    * DC Power supply room: Put all the Kepco and Sorensen in the drill press room.
Line 31: Line 38:

 * Things we want in there:
   * fans / computers / power supplies / UPS / other idea / We want to remove the mechanical workspace stuff and put it in WB.
Line 34: Line 44:
 * The left most workbench to be better organized
Line 35: Line 47:

 * North wall storage
 * Computer-related storage in plastic boxes
 * Organize the random items on the floor
 * Remove unrelated items
Line 38: Line 55:
 * Move the orphan rack doors somewhere.

 * Garbage collection

 * The clean booth not really clean. Particle level improvement

 * Clean supplies to be better organized

 * PD testing area + useless cart cleaning

 * Determine where to stock laser tools (sensor cards / it viewers) storage
Line 39: Line 68:
 * Remove OLD PSL - more space
Line 42: Line 72:
 * Clean up the clean booth table

 * Clean up the small table next to the clean booth

 * Tool organization

 * Vac area organization
Line 43: Line 81:

 * Garbage collection (screws)
Line 46: Line 86:
 * Organize the shelf for a determined purpose
Line 48: Line 90:
 * All Optics to be transported to this area of the lab.

 * Organize old videos / electronics / displays
Line 49: Line 95:

 * Salvage 40m stuff

 * Organize the cabinet stuff

 * Combine the bake lab remnant and the 40m cabinet remnant
Line 54: Line 106:
 * Door Sign
 * Poster
 * Add "LIGO Laboratory" Sign to either the entrance, or outside of the lab.

40m Lab Organization Plan

Overall

  • What's the point?
    • Modernization of the lab: Aim the use for another twenty years
  • Key categories
    • Convenience for the research progress
    • Quieter Lab
    • Organized Storage
  • Rack photographs

Entrance Area

  • Booties/safety glasses to be better organized
  • Wire shelf to be better organized
  • Remove the old furniture?
  • Needs a plan

Drill Press Room

  • Replace N2 bottles with a compressor (to be placed somewhere else like mezzanine)
  • Remove metal garbage
  • Missing vacuum cleaner
  • Not well organized
  • Always dirty due to metal debris
  • DeWalt/Makita charging situation
  • Drill Bits / Screwdriver Bits
  • Remove all the dirty stuff
  • Turn this room to
    • Server room
    • DC Power supply room: Put all the Kepco and Sorensen in the drill press room.
    • What's the AC situation?
  • Things we want in there:
    • fans / computers / power supplies / UPS / other idea / We want to remove the mechanical workspace stuff and put it in WB.

Office Area / Work Bench

  • The left most workbench to be better organized

Control Room

  • North wall storage
  • Computer-related storage in plastic boxes
  • Organize the random items on the floor
  • Remove unrelated items

Vertex hall

  • Move the orphan rack doors somewhere.
  • Garbage collection
  • The clean booth not really clean. Particle level improvement
  • Clean supplies to be better organized
  • PD testing area + useless cart cleaning
  • Determine where to stock laser tools (sensor cards / it viewers) storage

PSL Enclosure

  • Remove OLD PSL - more space

South End

  • Clean up the clean booth table
  • Clean up the small table next to the clean booth
  • Tool organization
  • Vac area organization

South Arm

  • Garbage collection (screws)

East End

  • Organize the shelf for a determined purpose

East Arm

  • All Optics to be transported to this area of the lab.
  • Organize old videos / electronics / displays

Bake Lab

  • Salvage 40m stuff
  • Organize the cabinet stuff
  • Combine the bake lab remnant and the 40m cabinet remnant

South Outdoor Storage

Exterier and Interier

  • Add "LIGO Laboratory" Sign to either the entrance, or outside of the lab.

40m_Organization (last edited 2024-05-25 02:29:05 by KojiaraiATligoDOTorg)