Differences between revisions 4 and 5
Revision 4 as of 2023-12-21 01:03:14
Size: 665
Comment:
Revision 5 as of 2023-12-21 01:05:17
Size: 971
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
  * What's the point?
     * Modernization of the lab: Aim the use for another twenty years
  * Key categories
     * Quieter Lab
     * Organized Storage
Line 6: Line 11:

 * Booties not well organized
 * Wire shelf not well organized
 * Remove the old furniture?
 * Needs a plan
Line 20: Line 30:
   * What's the AC situation?

40m Lab Organization Plan

Overwall

  • What's the point?
    • Modernization of the lab: Aim the use for another twenty years
  • Key categories
    • Quieter Lab
    • Organized Storage

Entrance Area

  • Booties not well organized
  • Wire shelf not well organized
  • Remove the old furniture?
  • Needs a plan

Drill Press Room

  • Remove metal garbage
  • Missing vacuum cleaner
  • Not well organized
  • Always dirty due to metal debris
  • DeWalt/Makita charging situation
  • Drill Bits / Screwdriver Bits
  • Remove all the dirty stuff
  • Turn this room to
    • Server room
    • DC Power supply room
    • What's the AC situation?

Office Area / Work Bench

Control Room

Vertex hall

PSL Enclosure

South End

South Arm

East End

East Arm

Bake Lab

South Outdoor Storage

Exterier and Interier

  • Door Sign
  • Poster

40m_Organization (last edited 2024-05-25 02:29:05 by KojiaraiATligoDOTorg)