Differences between revisions 1 and 4 (spanning 3 versions)
Revision 1 as of 2023-12-14 22:36:18
Size: 277
Comment:
Revision 4 as of 2023-12-21 01:03:14
Size: 665
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
== Overwall ==
Line 4: Line 6:

== Drill Press Room ==

 * Remove metal garbage
 * Missing vacuum cleaner
 * Not well organized
 * Always dirty due to metal debris
 * DeWalt/Makita charging situation
 * Drill Bits / Screwdriver Bits
 
 * Remove all the dirty stuff
 * Turn this room to
   * Server room
   * DC Power supply room
Line 24: Line 40:

== Exterier and Interier ==

 * Door Sign
 * Poster

40m Lab Organization Plan

Overwall

Entrance Area

Drill Press Room

  • Remove metal garbage
  • Missing vacuum cleaner
  • Not well organized
  • Always dirty due to metal debris
  • DeWalt/Makita charging situation
  • Drill Bits / Screwdriver Bits
  • Remove all the dirty stuff
  • Turn this room to
    • Server room
    • DC Power supply room

Office Area / Work Bench

Control Room

Vertex hall

PSL Enclosure

South End

South Arm

East End

East Arm

Bake Lab

South Outdoor Storage

Exterier and Interier

  • Door Sign
  • Poster

40m_Organization (last edited 2024-05-25 02:29:05 by KojiaraiATligoDOTorg)